Citrus CC Education Development CTR
Full-scale renovation and expansion of the Education Development Center.
Project
Citrus Community College Education Development Center
Horizons Construction undertook a full-scale renovation and expansion of the Education Development Center at Citrus Community College, incorporating advanced construction methods to maintain structural integrity while modernizing the facility. The scope began with the selective demolition of all interior finishes on both the first and second floors, ensuring that critical structural components were left intact and protected.
The first floor was reconstructed to support a modern testing center and administrative office space, reflecting the needs of a growing academic institution. On the second floor, upgrades included the development of new classrooms and a laboratory space designed for instructional use. Major structural enhancements involved the removal of an outdated south-facing shade structure and the construction of a new south canopy and screen wall, as well as a new elevator equipment room on the building’s west side.
Exterior improvements were comprehensive. The renovation upgraded stairwells, balconies, and canopies while applying a new exterior plaster to the Concrete Masonry Unit (CMU) walls on the second floor. Roof work included modifications to accommodate modern mechanical equipment, and targeted site upgrades enhanced both access and functionality across the property.
A significant part of the project included the construction of a second-floor addition housing a new science laboratory, preparation room, storage space, and four small central offices. Supporting infrastructure such as new plumbing, mechanical systems, upgraded electrical service, and a new elevator system were also installed to align with modern building standards and improve the operational efficiency of the facility.
Delivery Challenges
A major renovation and expansion project modernizing an academic facility through selective demolition, structural preservation, new classrooms, laboratory space, administrative functions, exterior upgrades, and substantial MEP and access improvements. This project reflects capability in modernization work, institutional environments, phased renovation thinking, and the integration of new systems into existing facilities.
project specs
Owner / Client
Citrus Community College
Location
1000 W. Foothill Blvd.
Glendora, CA 91741
Duration
570 Calendar Days
Completion Year
2023
Square Footage
32,415 SF
Project Type
Full-scale renovation and expansion of the Education Development Center.